FAST FACTS
|
CUSTOMER
Sterlite Industries |
LOCATION
Tuticorin, India |
PROJECT
US$ 81.4million expansion of smelting capacity. |
DATE
01-Jan-2004 |
PLANT DETAILS
Produces 180 000 tonnes per annum Copper Anode.
|
CONTROL SYSTEM
Yokogawa Centum CS3000 DCS; Siemens PLC
|
|
Project Overview:
Sterlite Industries was the first private sector smelter in India and has a reputation for focussing on efficient, environmentally friendly operations. In 2003/2004 Sterlite decided to upgrade their process control operations and increase copper smelter production capacity. This required a new larger ISASMELT™ furnace and associated Waste Heat Boiler, Rotary Holding Furnace, ESP, Acid plant and Refinery.
MIPAC Scope:
• Control system and instrumentation design for ISASMELT™ Furnace and Feed Preparation Area
• Control system configuration for ISASMELT™, Feed Preparation, ESP, Waste Heat Boiler
• Control System Training
• Supply of Lance Hoist control equipment packages
• Commissioning Assistance
Technical Highlights:
• Yokogawa Centum CS3000 DCS
• Siemens PLC for hoist package
• Siemens Flux Vector Drive.
Results:
As a result of the project Sterlite Industries can now boast a smooth operation with an increase in production capacity from 150,000 to 300,000 tonnes per year.
Sterlite was recently awarded a five star rating by the British Safety Council. This is the first time a Copper Smelter has been awarded such a high rating.