Project Profile





Yunnan Copper: ISASMELT™ control



FAST FACTS
CUSTOMER
Yunnan Copper Corporation
LOCATION
Yunnan Province, China
PROJECT
ISASMELT™ Smelter Project
DATE
01-Jan-2002
PLANT DETAILS
Plant produces 125,000 tonnes per annum of copper metal
CONTROL SYSTEM
Emerson Delta V






Project Overview:

Replace existing furnace with new technology ISASMELT™ furnace. Output 125,000 TPY copper metal. Associated works for the ISASMELT™ included a new Waste Heat Boiler and Oxygen Plant, as well as increased capacity of an existing Acid Plant.

MIPAC Scope:

• Control system and instrumentation selection
• Detailed design engineering of instrumentation and control system
• Control system configuration
• Commissioning assistance
• Brisbane-based and onsite training for YCC engineers

Technical Highlights:

• Emerson Delta V version 4.2 control system
• Successful technology transfer to site personnel with remote monitoring facilities for support

Results:

• YCC focus on training led to rapid start-up and a smooth transfer of technology
• Increased production capacity at reduced unit cost
• Dramatically improved environmental outcomes, reducing negative impacts
• Created safer operating environment
• Changed operating culture by introducing highly automated, centralised smelting control

Back to Project Summary | Tell A Friend

Tell a Friend

From:

To:

I found this article on the MIPAC website and I thought you may be interested.
 
Captcha Image
 
|  23-Jun-2010 02:53 PM
Follow MIPAC on Linked in