MMG Dugald River Greenfield Configuración acelerada Diseño de HMI Puesta en servicio

Cliente
MMG Dugald River
Ubicación
Dugald River, 65km north-west of Cloncurry, Queensland
Detalles de la planta
Plant wide control system configuration, HMI design and commissioning
Recuento de E / S
3200
Sistema de control
Schneider M580 PLC, Wonderware System Platform

Descripción del proyecto

 

Dugald River Mine is a greenfield mine and concentrator located 65km north-west of Cloncurry in Queensland. Dugald River Mine is a global top 10 zinc mine processing on average 1.7Mtpa to produce 170Ttpa of zinc  concentrate.

Alcance del proyecto

 

  • Plant wide control system, full concentrator, crushers to thickeners/filters
  • Develop standards and functional descriptions
  • Control system engineering, HMI design and configuration
  • FAT (factory acceptance testing) and architecture optimisation
  • Plant control system commissioning

Aspectos destacados del proyecto

  • Fast-tracked project, first production achieved ahead of schedule
  • Working seamlessly with Dugald River Mine stakeholders to achieve plant commissioning project milestones across multiple organisations
  • Advised and developed control standards for MMG
  • Smooth transition from project commissioning to operational support

Project Results

  • Optimisation of control system architecture to achieve plant control performance
  • Plant commissioning and first production delivered ahead of schedule
  • Coherent transition from project to 24/7 remote support of operations
  • Seamless evolution from project design/commissioning into operational process and production optimisation