First Quantum Minerals Ltd
Ubicación
120 km West of Panama City, Panama
Detalles de la planta
Concentrator - 300ktpa Cu production
Recuento de E / S
+70,000
PI System Interface
Siemens PCS7

Descripción del proyecto

 

Cobre Panama mine is a large copper deposit located approximately 120km west of Panama City. The Cobre Panama project consists of an open-pit mine, facilities for ore crushing, conveying, stockpiling and processing, as well as ancillary plant including a port and 300MW powerplant.

Alcance del proyecto

 

  • Full plant-wide control system (PWCS) design, configuration and commissioning
  • OSIsoft PI System server configuration and testing
  • PI-AF based plant hierarchy design and development including calculations and roll-up analyses
  •  
  • Implementation of Mipac Process Advantage™ (MPA) as the visualisation and communication tool for the power station
  • Installation and configuration of PI Integrator for Business Analytics and Power BI as the visualisation tool for the concentrator.

 

Aspectos destacados del proyecto

  • Mipac delivered a +70,000 point OSIsoft PI System to site and integrated it with the Siemens PWCS
  • The PI-AF tree contains +8,000 elements which can be classified into +400 element templates. Mipac developed +3000 PI analyses

 

  • Installation and configuration of the PI Integrator for Business Analytics. LIMS assay result integration to the nominated SQL Server target, and API integration into PI
  • Example reports developed with documented guidelines produced for site personnel to extend functionality of PI, MPA and Power BI

 

Solicita una devolución de llamada

Contáctenos

¿Tienes un proyecto? Hablemos.

sales@mipac.com.au
+61 7 3212 5600
Brisbane, Perth, Vancouver