PI Integrator for Business Analytics installation, configuration Power BI dashboards, PI data publishing to SQL

Клиент
First Quantum Minerals Ltd
Место расположения
120 km West of Panama City, Panama
Детали завода
Concentrator - 300ktpa Cu production
Счетчик ввода / вывода
+70,000
PI System Interface
Siemens PCS7

Обзор проекта

 

Cobre Panama mine is a large copper deposit located approximately 120km west of Panama City. The Cobre Panama project consists of an open-pit mine, facilities for ore crushing, conveying, stockpiling and processing, as well as ancillary plant including a port and 300MW powerplant.

Объем проекта

 

  • Full plant-wide control system (PWCS) design, configuration and commissioning
  • OSIsoft PI System server configuration and testing
  • PI-AF based plant hierarchy design and development including calculations and roll-up analyses
  •  
  • Implementation of Mipac Process Advantage™ (MPA) as the visualisation and communication tool for the power station
  • Installation and configuration of PI Integrator for Business Analytics and Power BI as the visualisation tool for the concentrator.

 

Основные моменты проекта

  • Mipac delivered a +70,000 point OSIsoft PI System to site and integrated it with the Siemens PWCS
  • The PI-AF tree contains +8,000 elements which can be classified into +400 element templates. Mipac developed +3000 PI analyses

 

  • Installation and configuration of the PI Integrator for Business Analytics. LIMS assay result integration to the nominated SQL Server target, and API integration into PI
  • Example reports developed with documented guidelines produced for site personnel to extend functionality of PI, MPA and Power BI

 