Newcrest Mining Limited

Process Control Improvements

Newcrest_Mining

The Gosowong Gold process plant was facing control/process performance issues due to two control systems and mixed generations of control strategy. The process was designed to recover gold using both gravity and cyanide leaching processes. Mipac was engaged to undertake an extensive full plant review including instrumentation, control and operator interface platforms and architecture, process safety, training and maintenance practices.

Project scope

Project highlights

Discover more of Mipac's projects

Control systems engineering partner for APA’s Diamantina Power Station Keeping the lights on in Mount Isa Location: Mount Isa, Queensland, Australia When …

Smelter 1

Transforming Legacy Systems Enhancing Operational Stability at a North American Smelter Location: North America Background and context This North American mineral processing …

ok tedi

Ok Tedi MPA Location: Papua New Guinea Technical Specs: AVEVA PI System and MPA Download case study Ok Tedi increases gold recovery …

CONTACT US

Got a project? Let's talk.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Request a
Demonstration

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Request a
Demonstration

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Request a
Demonstration

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Register for Webinar

Simply fill out the below form and we will send you the details of the webinar directly to your email.

[contact-form-7 id="8833"]

Download TCard Case Study

Simply fill out the below form and we will email you a copy of the MIM Case Study.

[contact-form-7 id="8768"]

Simply fill out the below form and we will email you a copy of our MPA product guide.