
First Quantum Minerals Cobre Panama Operator Training Simulator (OTS)
First Quantum Minerals Operator Training Simulator (OTS) Cobre Panama Number of Plant Operators: 10 Mipac was engaged to design, engineer and deploy a world class
First Quantum Minerals Operator Training Simulator (OTS) Cobre Panama Number of Plant Operators: 10 Mipac was engaged to design, engineer and deploy a world class
First Quantum Minerals Cobre Panama Project Overview Cobre Panama Copper Concentrator and Power Station I/O Count: 50,000+ Control System: Emerson Ovation, Allen-Bradley PLCs, Siemens PCS
First Quantum Minerals RtDuet Delay Accounting Cobre Panama Machine Centres: 54 Mipac was engaged from feasibility stage to design, configure and commission a full plant-wide
First Quantum Minerals Operator and Maintenance Interfaces (HMI) Cobre Panama Number of Plant Operators: 10 Mipac was engaged to design, engineer and deploy a world
First Quantum Minerals PI Integrator For Business Analytics Installation, Configuration Power BI Dashboards, PI Data Publishing To SQL Cobre Panama Concentrator – 300ktpa Cu production
First Quantum Minerals Power Station Control System Integration, Commissioning Startup and Synchronisation Paco Plant, Cobre Panama Power Station I/O Count – 17,000 Emerson Ovatio, Allen-Bradley
Reichhold Industries Ltd AVEVA PI System & AF Plant Historian Upgrade Canada, USA, Mexico, Brazil Port Moody, Canada Mogi, Brazil Pensacola, USA Azusa, USA Atlacomulco,
Mipac Pty Ltd
East Tower, Level 4,
410 Ann St,
Brisbane QLD 4000
AUSTRALIA
Mipac Inc
7225 N Oracle Rd
Suite 202,
Tucson AZ 85704
UNITED STATES OF AMERICA