
Control systems engineering partner for APA’s Diamantina Power Station
Control systems engineering partner for APA’s Diamantina Power Station Keeping the lights on in Mount Isa Location: Mount Isa, Queensland, Australia When you’re running the
Control systems engineering partner for APA’s Diamantina Power Station Keeping the lights on in Mount Isa Location: Mount Isa, Queensland, Australia When you’re running the
Ok Tedi Automation Roadmap Papua New Guinea Industry: Mining Project overview Between 2018 and 2020, the Mipac team worked in close collaboration with Ok Tedi
First Quantum Minerals RtDuet Delay Accounting Cobre Panama Machine Centres: 54 Mipac was engaged from feasibility stage to design, configure and commission a full plant-wide
Glencore Mount Isa Mines RtDuet Delay Accounting Mount Isa, Qld, Australia Machine Centres: 34 Glencore Mount Isa Mines (MIM) Copper Operations, located in North-West Queensland,
New Century Resources Mine RtDUET Delay Accounting North-West, Qld, Australia Machine Centres: 10 The Century mine operated for 16 years producing Zinc concentrate until the
Newcrest Mining Limited Process Control Improvements Gosowong, Indonesia I/O count: 3200 Rockwell SLC500, Rockwell Compact Logix, Citect SCADA, OSIsoft PI System The Gosowong Gold process
First Quantum Minerals PI Integrator For Business Analytics Installation, Configuration Power BI Dashboards, PI Data Publishing To SQL Cobre Panama Concentrator – 300ktpa Cu production
Reichhold Industries Ltd AVEVA PI System & AF Plant Historian Upgrade Canada, USA, Mexico, Brazil Port Moody, Canada Mogi, Brazil Pensacola, USA Azusa, USA Atlacomulco,
SunWater AVEVA PI System historian trial and expansion to 70 sites Queensland Awoonga Callide Pipeline AVEVA PI System (formerly OSIsoft PI ) SunWater is an
Mipac Pty Ltd
East Tower, Level 4,
410 Ann St,
Brisbane QLD 4000
AUSTRALIA
Mipac Inc
7225 N Oracle Rd
Suite 202,
Tucson AZ 85704
UNITED STATES OF AMERICA
Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.
Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.
Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.
Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.
Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.
Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.
Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.
Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.
Simply fill out the below form and we will send you the details of the webinar directly to your email.
Simply fill out the below form and we will email you a copy of the MIM Case Study.
Simply fill out the below form and we will email you a copy of our MPA product guide.