Ok Tedi’s AVEVA PI System Journey with Mipac

Share Post:

Ok Tedi, PNG’s longest-running open-pit mine, faced challenges including declining ore grades, operational instability, and diminished trust in process control systems.

In collaboration with Mipac, the Processing Improvement department harnessed the AVEVA PI System to tackle digital maturity gaps, inefficiencies, and equipment reliability issues.

This presentation highlights Ok Tedi’s data-driven recovery strategy, which delivered measurable outcomes, including a 2.4% increase in copper recovery and a 7.4% improvement in gold recovery.

Additionally, the presentation will detail Ok Tedi’s deployment of AVEVA Production Management and AVEVA Plant SCADA to support its operational advancements.

Speaker

Daniel Qiao is a lead systems and automation engineer with 7 years experience in Plant Information Management Systems and 12 years experience in detailed automation engineering design and commissioning in the gold, copper, nickel, magnesium, coal and mineral processing industry. 

He has project managed, designed, configured, commissioned and provided support for multiple AVEVA PI historian systems, and is also experienced in integrating the PI historian with various external systems (SQL databases, REST API).

Daniel is also proficient in building production reporting systems on PI Vision and Power BI using PI Asset Framework.

 

Watch Daniel’s AVEVA World presentation below, or download the slides:

Want to learn more?

Ok Tedi & Mipac Case Study

Subscribe

Enter your details to receive our newsletter

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Request a
Demonstration

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Request a
Demonstration

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Request a
Demonstration

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Register for Webinar

Simply fill out the below form and we will send you the details of the webinar directly to your email.

[contact-form-7 id="8833"]

Download TCard Case Study

Simply fill out the below form and we will email you a copy of the MIM Case Study.

[contact-form-7 id="8768"]

Simply fill out the below form and we will email you a copy of our MPA product guide.