Tenova TAKRAF
Crusher Control for 3 Semi-Mobile Crusher Stations
- Pilbara Region, Western Australia
- Iron Ore mine
- Control System PLC – Rockwell Control Logix SCADA – Rockwell FactoryTalk® View, PlantPAx
Tenova TAKRAF appointed Mipac to design and configure the control system for three semi-mobile crushers at a major project in Western Australia’s Pilbara region.
Project scope
- Develop the functional specification for the control philosophy in conjunction with Tenova TAKRAF
- Control system design and configuration
- Design of field cabling and remote I/O panels
- Highlighting areas where safety could be improved and incorporating this into the design
Project highlights
- Mipac’s design plans for one semi-mobile crusher is duplicated for the other two crushers, significantly reducing engineering costs – AVEVA design software was used to achieve this working seamlessly with the many stakeholders involved in the project
Discover more of Mipac's projects
Control systems engineering partner for APA’s Diamantina Power Station Keeping the lights on in Mount Isa Location: Mount Isa, Queensland, Australia When …
Transforming Legacy Systems Enhancing Operational Stability at a North American Smelter Location: North America Background and context This North American mineral processing …
Ok Tedi MPA Location: Papua New Guinea Technical Specs: AVEVA PI System and MPA Download case study Ok Tedi increases gold recovery …
CONTACT US