FQM Kansanshi Smelter

Plantwide control system for a greenfield 1.2MTPA copper smelter

Kansanshi is located in the North western province of Zambia near the bustling town of Solwezi. The Smelter is 80% owned by First Quantum Minerals (FQM). The Kansanshi smelter was a greenfield site adjacent to the Kansanshi open cast mine and concentrator. When in full operation, the smelter is designed to process 1.2 Mtpa of concentrate, producing over 300,000 tpa of copper metal. The smelter produced its first anode in December 2014 after a 36-month construction period.

Kansanshi

Project scope

Project highlights

Control room

Discover more of our projects

Ok Tedi Mtell Rollout

Unplanned maintenance was holding Ok Tedi back. With Mipac and Aspen Mtell, the team lifted plant reliability and performance

APA Diamantina Power Station

Mipac stabilised APA’s Diamantina Power Station, delivering tailored control upgrades that improved reliability, diagnostics, and long-term grid performance.

Smelter 1

The smelter’s legacy system risk is gone. Mipac migrated critical control into modern DCS infrastructure, reducing outage threats.

Ok Tedi Thumbnail

Ok Tedi’s plant automation with Mipac’s MPA and AVEVA PI boosted copper by 2.4 % and gold recovery by 7.4 %

Feedback from the client

We are very pleased with the performance of the smelter. The achievement of over 100% of nameplate capacity, in just three months from startup, is unprecedented. It is a credit to the design and project teams and illustrates the strong capabilities of the operations management and staff.

Philip Pascall Chairman and CEO, First Quantum
CONTACT US

Got a project? Let's talk.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Request a
Demonstration

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Request a
Demonstration

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Request a
Demonstration

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Register for Webinar

Simply fill out the below form and we will send you the details of the webinar directly to your email.

[contact-form-7 id="8833"]

Download TCard Case Study

Simply fill out the below form and we will email you a copy of the MIM Case Study.

[contact-form-7 id="8768"]

Simply fill out the below form and we will email you a copy of our MPA product guide.