MMG Dugald River
Fast-tracked Configuration HMI Design Commissioning
- Dugald River, 65km north-west of Cloncurry, Queensland
- Plant wide control system configuration, HMI design and commissioning
- I/O Count: 3200
- Control System: Schneider M580 PLC, Wonderware System Platform
Dugald River Mine is an open field mine and concentrator located 65km north-west of Cloncurry in Queensland. Dugald River Mine is a global top 10 zinc mine processing on average 1.7Mtpa to produce 170Ttpa of zinc concentrate.
Project scope
- Plant wide control system, full concentrator, crushers to thickeners/filters
- Develop standards and functional descriptions
- Control system engineering, HMI design and configuration
- FAT (factory acceptance testing) and architecture optimisation
- Plant control system commissioning
Project highlights
- Fast-tracked project, first production achieved ahead of schedule
- Working seamlessly with Dugald River Mine stakeholders to achieve plant commissioning project milestones across multiple organisations
- Advised and developed control standards for MMG
- Smooth transition from project commissioning to operational support
Discover more of Mipac's projects
Mineral processing plants often swing between good days and firefighting because of process variability. Poor PID tuning, manual overrides, orebody changes, and instrument drift all erode stability, leading to oscillating mill loads, unstable flotation froth, and volatile KPIs. The fastest, most cost effective way to restore control is targeted loop tuning. By retuning critical circuits and strengthening control strategies, you can turn oscillation into repeatability, improve recovery and grade, and lay the foundation for advanced process control.
Having a resilient mine in 2026 is no longer just about surviving disruptions – it’s about thriving in an increasingly complex mining …
As an engineer at Mipac, working on projects around the world is part of what makes life unique. Recently, we spoke with …