BHP Nickel West

NKS MicroXL / CS3000 Upgrade Project

BHP

The project consisted of replacing the obsolete MicroXL units and upgrading the existing CS3000 systems to Centum VP5. Identified safety instrumented functions (SIFs) from the hazard and operability studies (HAZOP) assessments were removed from existing software code and implemented in an independent safety instrumented system (SIS).

Project scope

BHP Nickel West Project

Project highlights

Discover more of Mipac's projects

man looking at tcard on computer

A North American gold processing plant reduced missed tasks and cut downtime by 30% by replacing whiteboards with real-time mining task management software. This case study shows how digital shift handovers improved accountability, visibility, and performance across 24/7 operations.

Mipac helped Elkview cut alarms by over 70 percent through ISA 18.2 aligned alarm rationalisation, PlantPAx logic and a cascade philosophy that improved operator confidence.

Ok Tedi Mtell Rollout

Unplanned maintenance was holding Ok Tedi back. With Mipac and Aspen Mtell, the team lifted plant reliability and performance

CONTACT US

Got a project? Let's talk.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Request a
Demonstration

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Request a
Demonstration

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Request a
Demonstration

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Register for Webinar

Simply fill out the below form and we will send you the details of the webinar directly to your email.

[contact-form-7 id="8833"]

Download TCard Case Study

Simply fill out the below form and we will email you a copy of the MIM Case Study.

[contact-form-7 id="8768"]

Simply fill out the below form and we will email you a copy of our MPA product guide.