Reichhold Industries Ltd

Operating Plant Control System Migration

Reichhold is one of the worlds largest suppliers of resins for composite and coating applications with over 25 manufacturing plants across the globe. The control system for the Port Moody plant in Canada was at the end of its support life and needed to be replaced with minimum impact on production. The most practical path was to migrate the existing Yokogawa Micro-XL to a Centum VP system.

Mipac’s extensive experience in both platforms and in undertaking operating plant upgrades and migrations underpinned this project. The plant had been operating from the existing control system for many years and original design documentation was often not available to support a migration. This required a significant effort in documentation and reverse engineering the current control strategies, process logic and alarm management.

Reichhold-Industries-Port-Moody-Plant

Project scope

Yokogawa Centum VP System Hardware

Project highlights

Discover more of Mipac's projects

Control systems engineering partner for APA’s Diamantina Power Station Keeping the lights on in Mount Isa Location: Mount Isa, Queensland, Australia When …

Smelter 1

Transforming Legacy Systems Enhancing Operational Stability at a North American Smelter Location: North America Background and context This North American mineral processing …

ok tedi

Ok Tedi MPA Location: Papua New Guinea Technical Specs: AVEVA PI System and MPA Download case study Ok Tedi increases gold recovery …

CONTACT US

Got a project? Let's talk.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Request a
Demonstration

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Request a
Demonstration

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Request a
Demonstration

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Register for Webinar

Simply fill out the below form and we will send you the details of the webinar directly to your email.

[contact-form-7 id="8833"]

Download TCard Case Study

Simply fill out the below form and we will email you a copy of the MIM Case Study.

[contact-form-7 id="8768"]

Simply fill out the below form and we will email you a copy of our MPA product guide.