First Quantum Minerals Operator and Maintenance Interfaces (HMI) Cobre Panama Number of Plant Operators: 10 Mipac was engaged to design, engineer and deploy a world
MMG Dugald River Fast-tracked Configuration HMI Design Commissioning Dugald River, 65km north-west of Cloncurry, Queensland Plant wide control system configuration, HMI design and commissioning I/O
Evolution Northparkes Mine Grinding Mill and Flotation Control Parkes, NSW, Australia Brownfield Grinding and Flotation Optimisation Schneider PLC, Citect HMI Mipac was asked to improve
PASAR Sulfuric Acid Plant PCS7 Software Upgrade and Optimisation Leyte, Philipines Acid Plant Control Upgrade Siemens PCS 7 V8.0 The PASAR Acid Plant was identified