Smarter maintenance, stronger performance: the first year of Aspen Mtell® at Ok Tedi
Unplanned maintenance was holding Ok Tedi back. With Mipac and Aspen Mtell, the team lifted plant reliability and performance
Unplanned maintenance was holding Ok Tedi back. With Mipac and Aspen Mtell, the team lifted plant reliability and performance
Mipac stabilised APA’s Diamantina Power Station, delivering tailored control upgrades that improved reliability, diagnostics, and long-term grid performance.
The smelter’s legacy system risk is gone. Mipac migrated critical control into modern DCS infrastructure, reducing outage threats.
Ok Tedi’s plant automation with Mipac’s MPA and AVEVA PI boosted copper by 2.4 % and gold recovery by 7.4 %
Glencore Mount Isa Mines TCard implementation Australia Mining Software Download the case study Background Mount Isa Mines Limited (MIM) operates copper, lead, zinc and silver
Mineral Resources Limited Wodgina Instrumentation Audit Australia Lithium Mining Background The Wodgina lithium operation is located approximately 120km south of Port Hedland in the Pilbara
Why Ok Tedi chose Aspen Mtell® to future-proof its operations Provision of Asset Management System Papua New Guinea Aspen Mtell® Mining A smarter way forward
Mipac upgraded Ok Tedi’s Kiunga facility with ABB 800xA DCS, enhanced instrumentation, operator training and remote commissioning to boost uptime and data visibility
Anglo American Quellaveco PCS Start-Up and Operation Support Quellaveco, Peru Siemens PCS7 | Profinet as Fieldbus | VMWare virtualisation system Mining Project Overview In May
Mipac integrated underground control systems at Cowal using Yokogawa Centum VP, enabling centralized monitoring, faster safety alerts, and improved operational oversight
Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.
Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.
Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.
Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.
Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.
Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.
Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.
Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.
Simply fill out the below form and we will send you the details of the webinar directly to your email.
Simply fill out the below form and we will email you a copy of the MIM Case Study.
Simply fill out the below form and we will email you a copy of our MPA product guide.