INSIGHTS

AVEVA PI System, Events & Webinars, MPA

Ok Tedi’s AVEVA PI System Journey with Mipac

Table of Contents

Ok Tedi, PNG’s longest-running open-pit mine, faced challenges including declining ore grades, operational instability, and diminished trust in process control systems.

In collaboration with Mipac, the Processing Improvement department harnessed the AVEVA PI System to tackle digital maturity gaps, inefficiencies, and equipment reliability issues.

This presentation highlights Ok Tedi’s data-driven recovery strategy, which delivered measurable outcomes, including a 2.4% increase in copper recovery and a 7.4% improvement in gold recovery.

Additionally, the presentation will detail Ok Tedi’s deployment of AVEVA Production Management and AVEVA Plant SCADA to support its operational advancements.

Speaker

Daniel Qiao is a lead systems and automation engineer with 7 years experience in Plant Information Management Systems and 12 years experience in detailed automation engineering design and commissioning in the gold, copper, nickel, magnesium, coal and mineral processing industry. 

He has project managed, designed, configured, commissioned and provided support for multiple AVEVA PI historian systems, and is also experienced in integrating the PI historian with various external systems (SQL databases, REST API).

Daniel is also proficient in building production reporting systems on PI Vision and Power BI using PI Asset Framework.

 

Watch Daniel’s AVEVA World presentation below, or download the slides:

Want to learn more?

Ok Tedi & Mipac Case Study

MIPAC INSIGHTS

Get our latest thinking in your inbox

Articles on process control, automation and operational data for mineral processing teams.

Mipac Insights

Read more from the Mipac Insights blog

View all insights
The team at MillOps 2026
At the 2026 Mill Operators Conference, many sites told Mipac their leadership wants advanced process control and AI. Our first question was ...
Learning new skills
Brisbane engineer John Robinson, who joined Mipac in 2022, has been promoted to Senior Control Systems Engineer. Supporting automation work at a ...
MPA Updates
MPA is continually updated based on feedback from users in the field. Check back here for the latest releases, new features and ...

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will email you a copy of our MPA product guide.