Mackay Sugar

Boiler Control Formal Compliance Audit

Mackay Sugar engaged Mipac to undertake a formal control system and control elements compliance audit of both No. 1 & No. 3 boilers to ensure they met Australian Standards and best practice.

Mipac assembled a team of senior qualified engineers and a boiler expert that undertook an engineering review against standards and best practice, a formal CHAZOP (Control Systems Hazard and Operability review) and documented findings and recommendations.

Project scope

Project highlights

Discover more of Mipac's projects

Ok Tedi Mtell Rollout

Unplanned maintenance was holding Ok Tedi back. With Mipac and Aspen Mtell, the team lifted plant reliability and performance

APA Diamantina Power Station

Mipac stabilised APA’s Diamantina Power Station, delivering tailored control upgrades that improved reliability, diagnostics, and long-term grid performance.

Smelter 1

The smelter’s legacy system risk is gone. Mipac migrated critical control into modern DCS infrastructure, reducing outage threats.

CONTACT US

Got a project? Let's talk.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Request a
Demonstration

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Request a
Demonstration

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Request a
Demonstration

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Register for Webinar

Simply fill out the below form and we will send you the details of the webinar directly to your email.

[contact-form-7 id="8833"]

Download TCard Case Study

Simply fill out the below form and we will email you a copy of the MIM Case Study.

[contact-form-7 id="8768"]

Simply fill out the below form and we will email you a copy of our MPA product guide.