Mackay Sugar

Boiler Control Formal Compliance Audit

Mackay Sugar engaged Mipac to undertake a formal control system and control elements compliance audit of both No. 1 & No. 3 boilers to ensure they met Australian Standards and best practice.

Mipac assembled a team of senior qualified engineers and a boiler expert that undertook an engineering review against standards and best practice, a formal CHAZOP (Control Systems Hazard and Operability review) and documented findings and recommendations.

Project scope

Project highlights

Discover more of Mipac's projects

A North American gold processing plant reduced missed tasks and cut downtime by 30% by replacing whiteboards with real-time mining task management software. This case study shows how digital shift handovers improved accountability, visibility, and performance across 24/7 operations.

Mipac helped Elkview cut alarms by over 70 percent through ISA 18.2 aligned alarm rationalisation, PlantPAx logic and a cascade philosophy that improved operator confidence.

Unplanned maintenance was holding Ok Tedi back. With Mipac and Aspen Mtell, the team lifted plant reliability and performance

CONTACT US

Got a project? Let's talk.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Request a
Demonstration

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Request a
Demonstration

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Request a
Demonstration

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Register for Webinar

Simply fill out the below form and we will send you the details of the webinar directly to your email.

[contact-form-7 id="8833"]

Download TCard Case Study

Simply fill out the below form and we will email you a copy of the MIM Case Study.

[contact-form-7 id="8768"]

Simply fill out the below form and we will email you a copy of our MPA product guide.