FQM Cobre Panama
Power Station Control System Integration, Commissioning Startup and Synchronisation
- Paco Plant, Cobre Panama Power Station
- I/O Count - 17,000
- Emerson Ovatio, Allen-Bradley PLCs
The Paco plant is a 300MW coal-fired power station with seawater cooling, consisting of 2 x 150MW turbines. This plant will provide base load to the Panamanian national grid and supply the Cobre Panama mine and mineral processing plant.
The site is 120km west of Panama City, remote from local support and presenting challenging logistics as well as climatic conditions. The site has required development of access, full port facilities, coal handling, and complete power station construction along with local camp, administration and warehousing.
Project scope
- Control System integration on site
- Construction support
- Control System Commissioning
- Power Station Startup
- National grid synchronisation
- Control System Support
Project highlights
- Mipac’s project team has interfaced across vendors, EPCM and construction organisations in this challenging location to integrate the control system to achieve commissioning, power station startup and synchronisation and delivery of power to the National grid
- First power from set 1 through to stable continuous 75MW production
- Operational support and production development continues for set 1
- Commissioning, startup and first power continues for set 2
Discover more of Mipac's projects
According to McKinsey, fewer than 10 percent of installed APC systems are properly optimised in some industrial companies. This article covers the four most common causes of Advanced Process Control failure in mineral processing, how to identify the warning signs, and what a structured remediation approach looks like.
APC readiness in mineral processing goes well beyond selecting the right software. Mipac's Optimisation Team Lead Drew Clements draws on direct site experience to explain why most APC projects underperform - from instrumentation gaps and model drift to operator trust and change management - and what a structured readiness audit actually reveals on the ground.