![[3:48 pm] Andrew Hislop two men looking at pipes, valves and pumps on a mine site wearing high vis, discussing how to make logic for its automatic control](https://www.mipac.com.au/wp-content/uploads/2023/09/IMG_7921-MP-LD21BE5-MP-LD21BE5-MP-LD21BE5-MP-LD21BE5-MP-LD21BE5-MP-LD21BE5-MP-LD21BE5-300x225.jpg)
Kamoto Copper Company Process Plant Optimisation
Kamoto Copper Company (KCC) Process Plant Optimisation Location: Democratic Republic of the Congo (DRC) Industry: Mining Control System: Siemens Step 7 (PLC) and WinCC (SCADA)
![[3:48 pm] Andrew Hislop two men looking at pipes, valves and pumps on a mine site wearing high vis, discussing how to make logic for its automatic control](https://www.mipac.com.au/wp-content/uploads/2023/09/IMG_7921-MP-LD21BE5-MP-LD21BE5-MP-LD21BE5-MP-LD21BE5-MP-LD21BE5-MP-LD21BE5-MP-LD21BE5-300x225.jpg)
Kamoto Copper Company (KCC) Process Plant Optimisation Location: Democratic Republic of the Congo (DRC) Industry: Mining Control System: Siemens Step 7 (PLC) and WinCC (SCADA)

Glencore Technology IsaMill™ Ultra Fine Grind Control Package Location: Kyrgyzstan Sector: Mining Control System: Rockwell PLC, Foxboro DCS Project overview Mipac completed a process control

Kazzinc Plantwide Control System Upgrade Ust-Kamenogorsk, Kazakhstan Emerson DeltaV Distributed Control System + CellView® Wireless solution Mining Project overview Mipac was contracted through Glencore Technology

Ok Tedi Automation Roadmap Papua New Guinea Industry: Mining Project overview Between 2018 and 2020, the Mipac team worked in close collaboration with Ok Tedi

West Musgrave Plantwide Control System Greenfield Accelerated Startup Musgrave, WA Mining Background Located in the Musgrave province of Western Australia, 1300km north east of Perth

Elk Valley Resources Greenhills Operations Project British Columbia, Canada Mipac was engaged by Teck Coal (now EVR) Greenhills in 2019 to improve its control system

First Quantum Minerals Operator Training Simulator (OTS) Cobre Panama Number of Plant Operators: 10 Mipac was engaged to design, engineer and deploy a world class

First Quantum Minerals Cobre Panama Project Overview Cobre Panama Copper Concentrator and Power Station I/O Count: 50,000+ Control System: Emerson Ovation, Allen-Bradley PLCs, Siemens PCS

First Quantum Minerals RtDuet Delay Accounting Cobre Panama Machine Centres: 54 Mipac was engaged from feasibility stage to design, configure and commission a full plant-wide

First Quantum Minerals Operator and Maintenance Interfaces (HMI) Cobre Panama Number of Plant Operators: 10 Mipac was engaged to design, engineer and deploy a world
Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.
Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.
Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.
Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.
Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.
Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.
Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.
Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.
Simply fill out the below form and we will send you the details of the webinar directly to your email.
Simply fill out the below form and we will email you a copy of the MIM Case Study.
Simply fill out the below form and we will email you a copy of our MPA product guide.