
Dugald River Solar Farm Control System Integration
Dugald River Solar Farm Control System Integration Mount Isa, QLD Allen Bradley ControlLogix PLC; Citect SCADA Energy & Renewables (Solar) Background APA’s Dugald River Solar

Dugald River Solar Farm Control System Integration Mount Isa, QLD Allen Bradley ControlLogix PLC; Citect SCADA Energy & Renewables (Solar) Background APA’s Dugald River Solar

Whitehaven Coal Narrabri Coal Loadout Facility Optimisation Project Gunnedah, NSW Allen Bradley ControlLogix PLC; Citect SCADA Site Overview The Narrabri coal mine is one of

Ernest Henry Mine Plantwide control system design and commissioning Cloncurry, Queensland Yokogawa control system Copper and Gold Project overview The Ernest Henry Mine, situated near

Kamoto Copper Company TCard Location: Kamoto Mine, Democratic Republic of the Congo Client: Kamoto Copper Company Technical Specs: TCard Download case study Project overview Kamoto

At Pogo mine, Northern Star eliminated Excel-based logsheets, saving over 1,500 hours annually with Mipac’s digital MPA solution.

Newmont Merian MPA Location: Suriname Client: Newmont Mining Corporation Technical Specs: AVEVA PI System and MPA Download case study How Newmont’s Merian mine saved hundreds
![[3:48 pm] Andrew Hislop two men looking at pipes, valves and pumps on a mine site wearing high vis, discussing how to make logic for its automatic control](https://www.mipac.com.au/wp-content/uploads/2023/09/IMG_7921-MP-LD21BE5-MP-LD21BE5-MP-LD21BE5-MP-LD21BE5-MP-LD21BE5-MP-LD21BE5-MP-LD21BE5-300x225.jpg)
Kamoto Copper Company (KCC) Process Plant Optimisation Location: Democratic Republic of the Congo (DRC) Industry: Mining Control System: Siemens Step 7 (PLC) and WinCC (SCADA)

Glencore Technology IsaMill™ Ultra Fine Grind Control Package Location: Kyrgyzstan Sector: Mining Control System: Rockwell PLC, Foxboro DCS Project overview Mipac completed a process control

Kazzinc Plantwide Control System Upgrade Ust-Kamenogorsk, Kazakhstan Emerson DeltaV Distributed Control System + CellView® Wireless solution Mining Project overview Mipac was contracted through Glencore Technology

Ok Tedi Automation Roadmap Papua New Guinea Industry: Mining Project overview Between 2018 and 2020, the Mipac team worked in close collaboration with Ok Tedi
Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.
Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.
Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.
Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.
Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.
Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.
Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.
Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.
Simply fill out the below form and we will send you the details of the webinar directly to your email.
Simply fill out the below form and we will email you a copy of the MIM Case Study.
Simply fill out the below form and we will email you a copy of our MPA product guide.